CyberTrackHQ
CYBERTRACK HQCHARGING MODULE INTERFACEV4 TAPER MODEL

How long does it take to charge a Cybertruck?

Time, energy, and cost — Supercharger taper or home Level 2

A Tesla Cybertruck Supercharges 20%→80% in about 32 min on a V4 stall (≈74 kWh added, averaging ~139 kW) — its 816-volt pack can pull up to 325 kW. A full 0%→100% home charge on an 11.5 kW Wall Connector takes about 10 hr 42 min. The battery is ~123 kWh.

Times from CyberTrack's V4 charge-curve model (calibrated to measured 2026 Cybertruck Supercharging sessions); home cost assumes ~$0.18/kWh (EIA 2026 U.S. residential average) and ~10% AC charging loss. Adjust any of it below.

Free account

The numbers above are the typical case. Sign in (free) to open the live charging calculator and adjust every input — charge level, trailer weight, speed, temperature, your electricity rate — for your exact build and trip.

Sign in to use the calculator
Pack123 kWhPeak charge323 kWSC 20→80%32 minHome 0→100%10 hr 42 minHome rate$0.18/kWh

Estimates — real charge time varies with temperature, battery state, and the station.